FAQ

FAQs

Sheds Galore and More

Frequently Asked Questions About Our Sheds

Call and speak with the friendly and knowledgeable staff at Sheds Galore and More with any questions, or ask about our rent-to-own program.

  • Can we purchase a shed off the lot? If so, what is the advantage?

    Yes, the advantage is normally delivery within 1 week.

  • Do we custom design?

    Unless a building is purchased off of the lot, they are all custom designed.

  • How can I determine how large of a building I need?

    Unless a building is purchased off of the lot, they are all custom designed.



    Many times it's better to go larger rather than smaller. However, we are here to assist you in determining what size of building you may need.

  • Are your buildings engineered to meet state and local codes?

    Yes.

  • Do we install electric?

    Most of our buildings come with an electrical package which includes outlets, a light switch, and a light fixture. We do not connect power to your shed. It is your responsibility to get the power to the shed and connect it to the shed.

  • How are your deliveries made?

    With a 4-wheel drive pickup truck and roll-back trailer, approximately 40-feet total length.

  • Do we do any site preparation?

    No, the area must be cleared and be leveled within 30″.

  • How much clearance is needed to deliver a shed?

    If we can go through an opening straight, we need 2-feet wider than the building and up to 14-feet in height on some structures. If you have a fence in the way, most often, it will be less expensive to remove a portion of the fence to allow access to our truck and trailer than to have the shed built on-site.

  • Do we come and check the property to see if the site can accommodate a shed?

    Normally no-- as long as the above dimensions are observed. If there is a concern, we'll visit the site for a fee that will be subtracted from the cost of the shed when purchased.

  • Does Sheds Galore and More or its subcontractors level the buildings?

    Yes, we block and level up to 30″. Typically we start at the highest corner with a 2″ solid block and level from that point. Typically we put a block pier every 6-feet or less under the building. All of the sub-floor in our buildings is constructed with 50-year ground contact pressure treated lumber.



     



    If you wish to have a building blocked higher than needed to get it level, there may be an additional charge, also if you want us to make an additional trip to make the building higher off of the ground, there will be an additional trip charge.

  • Does Sheds Galore and More or its subcontractors anchor the buildings?

    Yes, your building will be anchored down.

  • Do we do deliveries on the weekends?

    Yes, deliveries are scheduled for Monday through Saturday.

Share by: